Keep Projects on Track - Off-Grid, Day or Night.
Find out your carbon and cost savings in just 60 seconds.
Delivering reliable power and lighting to remote or constrained sites
Solar, hybrid and battery-powered systems provide dependable off-grid energy for highways, rail, utilities and infrastructure projects – removing the need for grid connections across remote or linear sites.
Reducing fuel logistics, cost and environmental impact
Solar-first operation significantly cuts diesel use, reducing fuel deliveries, site traffic and emissions while lowering operational costs across long-term projects.
Maintaining uptime across critical infrastructure projects
Our systems are designed for reliable, continuous performance, ensuring lighting and power are maintained across active works, possessions and operational environments.
Minimising site visits and operational overheads
With reduced refuelling and maintenance requirements, fewer site visits are needed – helping improve safety, reduce disruption and free up resource.
Operating in harsh and exposed environments
Engineered for UK conditions, our systems perform consistently across highways, rail corridors, coastal locations and remote infrastructure sites.
Supporting compliance and safe working environments
Well-designed lighting and reliable power support safe site operations, helping meet industry standards and reduce risk across public-facing and high-risk environments.
Infrastructure and utilities projects demand reliable power and lighting in locations where grid access is limited, constrained or unavailable – from remote pumping stations and highways to critical national infrastructure. You’re under pressure to reduce fuel use, emissions and site traffic while maintaining safe, compliant operations in harsh and exposed environments. Traditional diesel solutions introduce noise, refuelling logistics and ongoing maintenance that add cost, risk and operational complexity.
Prolectric’s solar, hybrid and battery-powered systems provide dependable, off-grid energy wherever it’s needed, without requiring a mains connection. From solar lighting towers to high-capacity battery energy storage systems, our solutions are engineered for UK conditions and long-term deployment, delivering silent, low-emission power with minimal servicing. With smart remote monitoring and flexible hire or purchase options, you can significantly reduce diesel use, minimise site visits and maintain reliable power and lighting across critical infrastructure – day and night.
Our systems are deployed across highways, rail, utilities and critical infrastructure, giving you confidence in performance across remote, complex regulated, high-risk projects and environmentally sensitive environments.
From grid-limited locations to remote and linear infrastructure, we design solar, hybrid and battery solutions around site constraints, load requirements and programme demands, helping you deliver projects without delays caused by power availability.
Our systems are built for continuous operation, supporting safe, uninterrupted performance across possessions, live environments and long-duration projects.
Solar-first operation significantly cuts diesel use, reducing fuel spend, deliveries, site traffic and maintenance requirements – reducing associated risks across large or distributed sites.
Smart telematics provide real-time insight into performance, usage and system status, enabling efficient fleet management and provide clear data on fuel, cost and CO₂ savings, supporting ESG reporting, compliance requirements and project business cases.
Our UK-wide rental fleet enables rapid deployment, with flexible hire aligned to your programme. From planning through to commissioning and support, we help keep projects on track.
Talk to our team and we’ll help you configure a solution that keeps your project running and on programme.
Working with Prolectric has transformed the A417 ‘Missing Link’ project. Their innovative, sustainable solutions exceeded expectations, delivering cost savings and reducing our carbon footprint. Remote monitoring improved efficiency, and reduced noise and emissions created a better environment. With projected annual savings of £638k and CO2e cuts of 800,000 kg. Their support made the transition effortless and their solutions have set a new standard for powering major infrastructure projects.
Gavin Jones
Project Manager, Kier Transportation | Highways Major Projects
We have approximately 50 Prolectric Solar Tower Lighting Units in use. We have a high level of confidence in both Prolectric as a business and the products they produce, as well as the after sales service and support they provide. As an Approved Vendor, the growing number of units has removed many Diesel powered equivalents from site. I would recommend Prolectric as they are amenable and professional, and I look forward to doing further business with them.
Richard Thompson
Reliability Engineer – Infrastructure Utilities, Sellafield
The ProPower unit managed itself – I could predict when it would need fuel, so it took very little of my time to manage. We were typically refuelling only every 3 months, versus weekly on a diesel generator. Through summer it didn’t need any at all. Once we sorted one minor issue (someone pushed the emergency stop button), there were no noise complaints. It’s a step in the right direction – we’re not releasing carbon when we don’t need to.
Ben Tomlinson
Project Manager, United Utilities
No two infrastructure or utility schemes are the same. From remote pumping stations and reservoirs to highways, substations and critical national infrastructure, each site presents unique challenges around access, power demand and regulatory requirements.
That’s why we offer more than a standard hire fleet. We work with your teams to design solutions that align with your site conditions, programme and operational requirements.
We design around:
Need something specific for a flagship scheme or framework? We’ll work with you to configure solar, hybrid and battery systems that reduce risk, control costs and support long-term operational resilience.
Controlled perimeter and walkway lighting. ProZone provides continuous, low-glare lighting for defined perimeters, walkways and controlled access zones.
Reliable lighting for infrastructure works and access routes. Solar lighting towers provide silent, zero-fuel illumination across infrastructure projects, supporting safe operations in remote or live environments.
Reliable off-grid power for operational infrastructure. ProPower delivers stable, solar-first power for infrastructure projects where grid access is limited or unavailable.
High-capacity power for infrastructure operations. ProCharge is designed to support higher-load, longer-duration infrastructure and utilities applications, providing reliable, off-grid power across complex or remote sites.
All products are available for hire or purchase and we can configure bespoke assemblies to suit your site layout, space constraints and integrated payload requirements.
Switching from traditional diesel-powered lighting and generators to Prolectric’s solar and hybrid solutions delivers measurable savings across infrastructure and utilities projects – while reducing reliance on fuel, logistics and maintenance.
By reducing fuel consumption, maintenance requirements and site visits, Prolectric solutions deliver a significantly lower total cost of ownership – particularly across long-duration, remote or multi-site infrastructure projects.
With reduced fuel logistics, fewer operational interventions and remote monitoring across deployments, you can manage multiple sites more efficiently while maintaining control over performance, cost and energy use.
Save 5,472 litres of fuel per year, reduce costs by £10,806 annually and mitigate 14,665 kg of CO₂e
Save £17,382 annually, reduce fuel use by up to 9,473 litres per year and mitigate 25,388 kg of CO₂e
Reduce fuel costs by 75%+ and save £69,000+ per year per unit
Infrastructure and utilities projects operate in high-risk, high-accountability environments where safety, uptime and compliance are critical. That’s why Tier 1 contractors, utilities and asset owners across the UK choose Prolectric when transitioning away from diesel.
Proven on major infrastructure projects
Our solar lighting and power systems are already deployed on projects including the A417 Missing Link, Hinkley Point C, Bristol Airport and reservoir monitoring in the Lake District. We are trusted by distribution network operators, water companies, highways and rail organisations across the UK.
Measurable cost and carbon savings
Our solutions deliver proven reductions in diesel use, CO₂ and operational costs, supported by real-world case studies. These savings help you build clear business cases and demonstrate progress against fuel, cost and ESG targets.
Engineered for long-duration, remote deployments
Designed for exposed and hard-to-access environments, our systems provide reliable, low-maintenance operation over extended periods, supporting infrastructure projects that run for months or years.
Full visibility and control across projects
Smart telematics provide real-time insight into system performance, usage and carbon savings across multiple deployments, supporting efficient management and reporting.
Delivered and supported by infrastructure specialists
From initial configuration and commissioning through to ongoing support, our team ensures systems are deployed correctly and perform reliably throughout the project lifecycle.
Talk to our team and we’ll help you configure a reliable off-grid solution that reduces cost, risk and fuel dependency. No obligation – just practical advice tailored to your project.
As the off-grid solar lighting and power experts, we offer solutions that are reliable, commercially viable and environmentally responsible.
Call us for an urgent query on 01275 400570,
email us or fill out the short form below.