Built for Commercial
Construction Sites

Sustainable. Cost-effective. Ready to Hire.

How much could
you save?

Find out your carbon and cost savings in just 60 seconds.

Your challenges - Our solutions

Reduced Noise icon

Noise-sensitive commercial zones with residents, wildlife, live operations or trading nearby.

Silent solar lighting and low-noise hybrid power – avoids generator noise and fumes, helping you maintain safe working areas without breaching local restrictions or upsetting neighbours.

Diesel Savings icon

Logistics and safety risks from frequent fuel deliveries and refuelling.

Solar-first systems dramatically cut fuel use and refuelling runs. Fewer deliveries mean lower risk, reduced spillage, less traffic on site and simpler logistics.

Reduced Emissions icon

Client pressure to reduce emissions and evidence ESG performance.

Smart Remote telematics portal provides live data on fuel, CO and runtime, giving you clear evidence of savings for client reporting, tenders and ESG commitments.

Calendar icon

Phase-based project requirements that change as the build progresses.

Fleets can be staged, scaled and redeployed as compounds move and phases change, so you only pay for what each stage needs.

Tower Light blue icon

Limited space and complex site layouts around live buildings or busy yards.

Compact towers, column lighting and festoon or link lighting options fit into tight compounds, access routes and perimeters, giving you coverage without blocking valuable space.

Advanced Technology blue icon

Multiple subcontractors on site and limited visibility of how equipment is used.

Remote monitoring gives you site-wide control of runtime, locations and performance across your fleet, helping you manage usage, downtime and accountability.

Minimal Maintenance icon

Tight deadlines and limited set-up time between phases or handovers.

Plug-and-play, rental-ready systems are quick to deploy and simple for site teams to operate, so you can get critical areas lit and powered without lengthy set-up.

Frequently asked questions?

Still have questions?

Speak to an expert
CN Awards 2023 Winner HR
ISO 9001 Certified
Kier Logo
2023 Winner Graphic Energy & Sustainability
DarkSky Approved logo Black
Vistry Group Logo
QA Logo Categories 2021 Sustainable Digital Blue
SMAS WorkSafe Logo
Bristol Airport Logo
Cyber Essentials Certification
The Ministry Of Defence Logo

Powering your project without compromise

Commercial construction sites need reliable lighting and power that keep projects moving without adding risk, noise or unnecessary cost and without disturbing local communities.

Our solar tower lights, hybrid generators and battery storage units are designed for large, multi-phase commercial builds. We provide full support, with rental-ready and remotely monitored as standard, options to buy or configure bespoke systems around your programme.

Deliver your project on time and within budget, while cutting fuel use, reducing emissions and improving working conditions on site – all with solutions that are proven on some of the UK’s most demanding commercial projects.

Why Prolectric for commercial builds?

Our solar-first products solve the toughest challenges on commercial sites:

Built for complex, multi-phase construction sites

Our solutions are designed for large, evolving projects where layouts, timelines and requirements constantly change – from early groundworks through to final handover.

Reduce reliance on diesel and grid infrastructure

Solar-first lighting and hybrid power systems significantly cut fuel use and remove dependency on grid connections, helping avoid delays, reduce costs and improve efficiency.

Scalable solutions across your entire project

Deploy, relocate and scale systems as your site develops, ensuring consistent lighting and power across every phase without disruption.

Full visibility and control across site operations

Smart remote monitoring provides real-time insight into performance, energy use and carbon savings – helping you manage assets and optimise site efficiency.

Proven performance in demanding site conditions

Engineered for UK weather and harsh construction environments, our systems deliver reliable, year-round operation across active and high-risk sites.

Flexible deployment with expert support

From trials and rental to full rollout, we support your project with tailored solutions, lighting design and ongoing support aligned to your programme.

Running a complex construction site?

Talk to our team and we’ll help you plan, configure and deploy the right lighting and power solution for your project.

Prolectric ProCharge BESS 3-Phase open

What our clients have to say

Bespoke solutions for complex construction projects

No two construction sites are the same. Our in-house engineers work with you to design lighting and power solutions tailored to your site layout, programme and operational requirements.

We design around:

  • Site layout and phasing: compounds, laydown areas, access routes, perimeters and changing work zones across multiple phases.
  • Operational schedules: from 24/7 builds and night shifts to restricted working windows in live environments.
  • Safety and compliance: ensuring consistent lighting coverage and reduced risk across active sites.
  • Carbon reduction targets: supporting ESG goals and reducing fuel consumption with clear reporting from telematics.
  • Site constraints: including noise, access limitations and sensitive environments, tight urban sites or mixed-use developments.
  • Welfare, security and services power: providing the right mix of lighting, hybrid power, battery storage units (BESS), CCTV and connectivity for cabins, security points and ancillary loads.

Need something specific? We’ll design and configure a solution that fits your project.

Prolectric ProZone Smart Solar Festoon Lighting
ProZone Smart Solar Festoon Lighting

Intelligent perimeter and walkway lighting for active construction sites. ProZone delivers continuous, low-glare perimeter and walkway lighting designed for construction and infrastructure projects. Unlike diesel tower lights spaced along fencing lines, ProZone creates consistent, controlled illumination across site boundaries, access routes and working zones – without noise, emissions or refuelling disruption.

  • Creates clearly defined, well-lit perimeters, walkways and access routes across active sites
  • Reduces light spill while maintaining safe visibility for operatives and public interfaces
  • Solar-powered, silent operation removes fuel use, noise and ongoing maintenance
  • PIR-activated lighting ensures illumination only where and when it’s needed, improving efficiency and reducing wasted energy
  • Simple to install and easy to adapt as site layouts evolve across project phases
Common uses
  • Site perimeter fencing and boundary security
  • Temporary pedestrian walkways and access routes
  • Public interface zones and hoarding lines
  • Compounds, welfare areas and storage zones
  • Phased construction areas and changing work zones
  • Dark-sky or residential-sensitive project locations
ProZone Smart Solar Festoon Lighting
Prolight deployed at construction site
Solar Lighting Towers
  • Silent, zero-fuel lighting ideal for compounds, access routes, car parks, perimeter fencing and roadways – especially in mixed-use or sensitive locations.
  • Removes generator noise, fumes and refuelling risks – perfect for sites near occupied buildings, businesses or residential neighbours.
  • Proven year-round performance across logistics hubs, distribution centres, business parks and large commercial developments.
  • Rapid deployment, redeployment and scaling make it ideal for multi-phase construction, demolition, refurbishment or fit-out projects.
  • Scalable lighting coverage lets you add or remove towers as site size or requirements change – offering flexibility for evolving project phases and safety needs.
Common uses:
  • Site entrances and exits
  • Compounds, welfare and car parks
  • Haul roads and access tracks
  • Working areas and active construction zones
  • Laydown areas, storage yards and material loading zones
  • Perimeter security and night-time protection
  • Temporary pedestrian routes and public interface areas
  • Remote or off-grid work fronts
ProLight Solar Lighting Tower
ProPower Solar Hybrid Generator on the A417 Missing Link project construction site during the day.
ProPower Solar Hybrid Generator
  • Delivers stable off-grid electricity for cabins, welfare units, tool stations, temporary offices or workshops where mains power is unavailable or costly to extend.
  • Cuts fuel consumption by up to 80%, reducing fuel spend, logistics and environmental impact – ideal for meeting ESG targets and lowering operational costs.
  • Low-noise operation supports work near live buildings or operational areas, suited to refurbishment, commercial estates, healthcare or education sites.
  • Remote monitoring provides full visibility of usage, helping managers track subcontractor consumption, prevent misuse and ensure compliance.
  • Flexible configuration enables integration with solar or BESS systems, offering hybrid or fully renewable power options to suit site demands.
Common uses:
  • Temporary welfare units and site cabins power supply
  • Site accommodation and security lighting / power
  • Power tools and equipment on remote sections of site
  • Temporary offices or control rooms on phased builds
ProPower Solar Hybrid Generator | Single Phase
Prolectric ProCharge Solar Battery Energy Storage System
ProCharge Solar Battery Energy Storage System (BESS)
  • High-capacity, silent energy storage ideal for compounds, welfare units, temporary power distribution and high-load equipment.
  • Reduces reliance on traditional generators and supports ESG goals – valuable for sustainability targets & pre-construction planning.
  • Charging from solar-hybrid sources enables near-zero-fuel operation, delivering clean, quiet, efficient power for extended periods.
  • Purpose-designed for site power integration, working effectively across complex layouts, phased build zones and mixed-use developments.
  • Supports silent night-time running of high-load site equipment, maintaining power continuity without generators, noise or refuelling.
Common uses:
  • Night-time or 24/7 power for welfare blocks, site offices and essential site infrastructure
  • Silent power supply for high-load site facilities s – ideal for noise- or emissions-restricted sites
  • Power distribution for demanding plant and equipment where mains power is unavailable
  • Hybrid solar & BESS configurations supporting long-duration, off-grid power on large, multi-phase sites
ProCharge Solar Battery Energy Storage System (BESS) | Three-Phase

Why choose Prolectric solutions?

All products are available for hire or purchase and we can configure bespoke assemblies to suit your site layout, space constraints and integrated payload requirements.

Reduce cost, fuel use and operational overheads

Switching from traditional diesel-powered lighting and generators to Prolectric’s solar and hybrid solutions delivers measurable savings across your project.

ProLight Solar Lighting Tower

By switching from a traditional diesel tower light to our ProLight Solar Lighting Tower, you will save on average 5,472 litres of fuel annually, £10,806 in operational costs and mitigate 14,665 kg of CO2e.

ProPower Solar Hybrid Generator

Switching from a 40 kVA diesel generator to our ProPower Solar Hybrid Generator, saves on average £17,382 annually in operational costs, up to 9,473 litres of fuel annually and mitigates 25,388 kg of CO2e.

ProCharge Solar BESS

Reduce fuel costs by 75%+ and save over £69,000 in fuel costs per year – per unit! Deliver clean, quiet, more efficient site power.

Lower total cost of ownership

By reducing fuel consumption, maintenance and site visits, our solutions deliver a significantly lower total cost of ownership – particularly across long-term or multi-phase construction projects.

Why leading commercial contractors trust Prolectric

Commercial construction is high-pressure: tight deadlines, strict ESG requirements, live trading neighbourhoods and evolving site layouts. That’s why major contractors across the UK choose Prolectric as they move away from diesel.

Proven on major commercial builds
From distribution hubs and logistics centres to hospitals, data centres and retail developments, our systems have delivered dependable lighting and power across some of the UK’s most complex commercial sites.

Silent and low-impact operation
Our solar and hybrid systems reduce noise, emissions and site disruption, helping contractors work safely alongside live buildings, trading areas and residential neighbours.

Measured carbon, cost and fuel savings
Smart telematics provide clear data for tenders, ESG reporting and client transparency – proving reductions in CO, runtime, fuel use and operational cost.

Rental flexibility across multi-phase programmes
Systems can be hired, redeployed and scaled as compounds move, phases change and requirements shift, ensuring you only pay for what each stage needs.

Safer, cleaner, more predictable logistics
With far fewer fuel deliveries and refuelling tasks, you reduce vehicle movements, spill risk and unproductive downtime – improving site safety and performance.

Plan your site lighting and power with confidence

Speak to our team and we’ll help you design a solution that reduces cost, improves efficiency and keeps your project running smoothly. No obligation – just practical advice tailored to your site and programme.

Contact Us (General)
Please provide a business email address or use the live chat to speak to us.

We guarantee response within 24 hours.

Fields marked with an asterisk (*) are required and must be completed. Prolectric is committed to protecting your privacy. By clicking submit, you agree that we may use your personal data to respond to your enquiry, in accordance with our Privacy Notice.

Explore Our Range of Products

As the off-grid solar lighting and power experts, we offer solutions that are reliable, commercially viable and environmentally responsible.

Brochure Download
Please provide a business email address or use the live chat to speak to us.

We guarantee response within 24 hours.

Fields marked with an asterisk (*) are required and must be completed. Prolectric is committed to protecting your privacy. By clicking submit, you agree that we may use your personal data to respond to your enquiry, in accordance with our Privacy Notice.

Freya

Can’t find what you’re looking for?

Call us for an urgent query on 01275 400570,
email us or fill out the short form below.

Have You Found Your Solution?
Please provide a business email address or use the live chat to speak to us.

We guarantee response within 24 hours. Fields marked with an asterisk (*) are required and must be completed. Prolectric is committed to protecting your privacy. By clicking submit, you agree that we may use your personal data to respond to your enquiry, in accordance with our Privacy Notice.

Prolectric Services
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.